Buying off-plan means buying a drawing, a specification and a promise. The whole gap between the promise and the delivered building is settled in the documents signed before the first shovel. That is where we step in.

What you are actually buying

You buy a share of the land, common areas, and a unit whose characteristics are set out in a specification. That document, often short, is the contractual basis for what you will receive. If it is vague, you carry the risk.

Six points to check before signing

  • The specification: materials, equipment, brands, finish levels
  • The plans and the surfaces actually sold
  • The delivery schedule and the consequences of delay
  • The warranties and handover arrangements
  • The land share and the allocation of charges
  • The status of the building permits

The trap of a vague specification

"Quality flooring" means nothing. "Three-ply oak parquet, use class 23/31" sets a level. The difference is invisible at signature and obvious at delivery, when it is too late to negotiate.

After signature, until handover

The mission does not end with the contract. We follow finish selections, variations, site progress and the handover. Every decision with a cost or a deadline is formalised in writing.

Typical case

In a new development, the specification announced a "fitted kitchen". Once clarified, it covered base units only, with no appliances and no worktop. The clarification obtained before signature avoided an unbudgeted expense.

Frequently asked

Questions owners ask us

No. VEFA is a French contract that does not exist in Swiss law. In Switzerland the terms are off-plan purchase, forward sale or off-plan condominium. The wording matters: it determines the protection you have.

Before signing the reservation or sale contract. That is when everything is decided and corrections are still free.

The elements that are expensive to redo: envelope and windows, technical installations, kitchens and bathrooms, floor and wall finishes. Decorative items come second.

It depends on the contract clauses and the circumstances. We check what is provided, document the delay and prepare the supporting elements. A contract read properly at the start avoids most of the unpleasant surprises.

A 30-minute call is enough to assess your situation.