Construction defects in Geneva PPE: what recourse for buyers in 2026?

Since January 1, 2026, the Swiss real estate legal landscape has undergone a major transformation. The revision of the Code of Obligations (CO) provides increased protection for condominium buyers, addressing long-standing concerns regarding construction defects.
If you are facing construction defects in a Geneva condominium, understanding these new rules is essential for effective action.
A new 60-day notice period for defects
One of the most significant advances of the reform is the abandonment of the requirement to report defects "immediately." From now on, for contracts concluded on or after January 1, 2026, the buyer has a mandatory 60-day period to notify any defect from the moment of discovery (art. 219a al. 1 CO).
This measure ends the legal uncertainty associated with the subjective assessment of immediacy. Note that any shorter contractual deadline is now null and void.
The right to repair: a strengthened obligation
The reform establishes a mandatory right to free repair for new constructions (art. 219a al. 2 CO). Previously, developers could limit buyer recourse through restrictive clauses.
For a building erected less than two years before the sale, the seller can no longer exclude or restrict your right to demand the repair of defects. This ensures better handling of defects by those responsible.
Prescription and legal certainty
The five-year limitation period for construction defects remains the standard, but it has acquired a partially mandatory character (art. 371 al. 3 CO). No contractual clause can now reduce this period to the detriment of the buyer.
This stability allows owners to plan their actions with greater peace of mind. Vigilance remains necessary during the acceptance of works.
Why technical support is essential
Despite these legislative advances, the technical complexity of construction sites in Geneva remains. Identifying, documenting, and notifying a defect in the proper legal form requires specialized expertise.
At KERLINE SA, we act as an Owner's Assistant (AMO) to secure your interests through services such as:
- Monitoring work compliance
- Assisting with the final inspection
- Upholding your rights against contractors and developers
Conclusion: securing your project with KERLINE
The 2026 reform is a victory, but it does not replace rigorous on-site supervision. To learn more, we invite you to read the analyses from OAKS.
KERLINE SA, a member of SwissEngineering, supports you at every stage to ensure your real estate purchase remains a lasting success.
Further reading
In the OAKS journal