Articles
AdviceSeptember 18, 2026

New construction: what checks before the handover?

New construction: what checks before the handover?

The handover of the keys marks the final milestone of your construction project, but it is also a critical moment where rigor is essential. Conducting an exhaustive handover verification ensures that the work faithfully corresponds to the plans and contractual standards before formally accepting delivery.

Project acceptance under the SIA 118 standard

In Switzerland, the acceptance procedure is generally governed by the SIA 118 standard, which defines the contractual framework between the owner and the contractors. During the final walkthrough, it is crucial to examine every finishing element. A detailed inspection allows all apparent defects to be recorded in an official report. It is vital to leave nothing to chance, as defects not noted during this stage could be considered accepted.

Why seek professional support

For individuals, identifying technical flaws or non-compliance with Geneva's cantonal building codes can be complex. Using an Owners' Representative (AMO) provides independent technical expertise. At KERLINE SA, we exclusively represent your interests. Discover our owners representative services to secure your handover process. An expert will be able to spot issues invisible to the untrained eye, such as sealing defects or poor adjustment of joinery.

Essential technical checkpoints

During the visit, pay particular attention to finishes and system operations. Check the proper functioning of electrical, heating, and ventilation systems. Ensure that flooring, paintwork, and joinery are free from scratches or dents. Material compliance is often overlooked; verify that they match the choices made during the selection phase.

The handover report: a key legal step

The handover report (PV) is the document that closes the construction site. It must be written with precision and exhaustively list all reservations. Never sign a document that does not mention the observed defects. The Swiss Code of Obligations governs builder liability, but the quality of the handover remains your best lever to ensure the correction of defects within the deadlines set by the contractors.

Conclusion and support

Receiving your keys should be a moment of joy, not stress. Anticipating every step is the secret to a successful delivery. To benefit from personalized, expert support for your property handover, please do not hesitate to contact us. With 25 years of experience, KERLINE SA is your trusted partner in Geneva to ensure your future home meets all your expectations.

Further reading

In the OAKS journal

Related articles on KERLINE

Need expert guidance?

Let's discuss your project in 30 minutes.

Contact us
This site uses essential cookies to ensure proper functionality. No advertising cookies are used. Privacy Policy