Building, buying or renovating a property involves technical, financial and contractual decisions that can have significant consequences. In French-speaking Switzerland, owner’s representation, known as assistance à maîtrise d’ouvrage (AMO), provides owners, buyers and investors with specialist support to better understand their project, anticipate risks and oversee the key stages through to handover.

A property project is about more than drawings, a budget and a construction schedule. It involves numerous participants, a succession of technical choices and contractual commitments that must remain consistent throughout the operation.

For an individual, this complexity can quickly become difficult to manage. For an investor or developer, it requires rigorous organisation and an overall understanding of the issues at stake.

This is where owner’s representation (AMO) becomes particularly valuable. By offering the project owner a complementary perspective, it helps structure decisions, clarify the expected scope of work and facilitate project monitoring.

Why seek support for a property project?

Buying a new home or undertaking construction work often represents a major financial commitment. Yet future owners do not necessarily have the technical knowledge needed to assess all the implications of their decisions.

Choosing a material, changing a drawing, adding an option or altering a building system can affect the final cost, deadlines and coordination between contractors.

Difficulties arise particularly when the client’s expectations have not been sufficiently formalised, when specifications are imprecise or when different participants interpret the project documents differently.

Appropriate support makes it possible to step back from these situations and better understand the issues before making a decision.

AMO therefore acts as a partner to the project owner. It helps identify areas requiring attention, review the available information and organise the actions needed to preserve the project’s objectives.

The role of owner’s representation

Owner’s representation involves supporting the client in managing their property project, according to the agreed mandate and identified needs.

It is distinct from the roles of the architect, engineer or general contractor. These professionals have specific responsibilities relating to design, technical studies or construction. AMO supports the project owner in making decisions and protecting their interests.

Depending on the nature of the project, its involvement may include:

  • analysing the client’s needs and objectives;
  • reviewing drawings, specifications and technical documents;
  • identifying inconsistencies and matters requiring clarification;
  • assisting with the selection of materials and specifications;
  • tracking decisions and changes;
  • analysing potential effects on the budget and schedule;
  • preparing for property handover;
  • maintaining records of defects and outstanding matters.

The precise scope of the assignment must be defined in advance. This clarification enables the project owner to understand the services included, each participant’s responsibilities and the limits of the support provided.

Buying a new home: understanding what you are really buying

Buying an apartment or villa off-plan has a distinctive feature: a significant part of the property is defined through technical and contractual documents before the home is even completed.

Drawings, construction specifications, finish selections and equipment determine the characteristics of the future home. Understanding them is essential to avoiding discrepancies between the buyer’s expectations and the delivered result.

However, these documents can be complex for someone unfamiliar with construction terminology.

Owner’s representation can help buyers better understand what is included, identify matters that require explanation and prepare for decisions to be made during the project.

Technical choices with practical consequences

A change to the internal layout may affect electrical installations, ventilation or other technical elements. Replacing a material may alter the budget or require specific approval. A request made late in the process can also create construction constraints.

The aim is therefore to make decisions at the right time and understand their consequences before approving them.

Structured support helps document choices more effectively and keep a record of agreed changes.

Construction monitoring: identifying difficulties before they escalate

Monitoring a property project requires constant attention to consistency between the specified work, the decisions made and construction progress.

Problems are not always immediately visible. Some arise from poor coordination, incomplete information or decisions that have not been communicated to everyone concerned.

In this context, document management plays an essential role. Correspondence, approvals, changes and observations must be organised so that the project’s history can be clearly understood.

AMO can contribute to this process by helping the project owner to:

  • Clarify decisions. Choices and changes must be sufficiently precise to limit differing interpretations.
  • Identify areas requiring attention. Matters that could affect quality, the budget or the schedule must be brought to the project owner’s attention.
  • Facilitate coordination. Questions requiring input from the architect, engineer or relevant contractor must be identified and followed up.
  • Maintain structured documentation. Documents needed to monitor the operation must remain accessible and consistent.

This approach promotes more transparent project management and makes difficulties easier to address when they arise.

Property handover: a stage requiring methodical preparation

The handover of a home is a pivotal moment for the owner. In particular, it provides an opportunity to inspect the property, record visible defects and formally document matters requiring attention.

This stage should not be improvised. Insufficient preparation can make it harder to identify problems and follow them up after the keys have been handed over.

A structured approach generally includes preparing checks, examining accessible elements, documenting observations and drawing up a list of outstanding matters.

When defects are identified, it is important to describe them precisely, preserve relevant evidence and notify the parties concerned in accordance with the applicable legal and contractual requirements.

Notification deadlines and procedures vary according to the legal framework and contracts involved. The project owner must therefore ensure compliance with the rules applicable to their situation.

AMO can provide technical and organisational assistance at this stage. However, it does not replace a lawyer when complex legal questions arise or a dispute requires an in-depth assessment.

Construction defects: the importance of documentation

Identifying a defect in a home is not always enough to resolve the difficulty. It must also be possible to describe the problem, establish the circumstances of its discovery and organise its resolution.

A dated photograph, a precise description, the location of the defect and correspondence with the parties involved can help build a useful record for follow-up.

Traceability makes it possible to distinguish between recorded defects, requests sent, responses received and work carried out.

It also facilitates checking what remains to be corrected and preserving the history of the case.

The federal reform of construction defects law, which came into force on 1 January 2026, reinforces the importance of understanding the rules applicable to property projects. In particular, it changes certain aspects of defect notification and the right to rectification.

The practical consequences must be assessed in light of the relevant contract and the project owner’s situation. Good document management is a valuable tool, but it does not replace compliance with statutory deadlines or legal analysis when necessary.

Expertise for owners, investors and developers

Owner’s representation is not limited to buyers of newly built homes.

For owners renovating a building, AMO can help clarify objectives, review proposed solutions and track decisions that influence costs and deadlines.

For investors, it can provide an additional perspective on the risks associated with delivering a project and facilitate monitoring of its different stages.

For property developers, support may cover defining specifications, preparing handovers, coordinating information and organising the follow-up of potential defects.

Each situation requires a tailored approach. The objective is not to systematically apply the same method to every project, but to define support that reflects its complexity, schedule and the project owner’s expectations.

KERLINE SA: a structured approach to property project support

Based in Geneva, KERLINE SA develops a specialist approach to owner’s representation and property project support.

Originating from OAKS GROUP, a company active in property development, KERLINE has drawn on practical knowledge of the challenges encountered during a property operation, particularly the relationship between project requirements, technical specifications and buyers’ expectations.

Its development as an independent business enables it to offer its services to a range of project owners and property professionals.

This independence reflects a commitment to providing support tailored to each client’s specific needs, within a clearly defined mandate.

Its involvement may focus on making documents easier to understand, structuring decisions, identifying matters requiring particular attention and organising the monitoring of important project stages.

KERLINE’s approach rests on a simple idea: project owners should be able to understand what is at stake, have the information they need to make decisions and benefit from organised support throughout the operation.

How should you choose an owner’s representative?

Selecting an AMO provider should be based on several criteria beyond the cost of the service alone.

  • Understanding the project. The professional must be able to identify the specific issues involved and propose an appropriate assignment.
  • Clarity of the mandate. Services, responsibilities, limits of involvement and communication arrangements must be defined from the outset.
  • Technical experience. Knowledge of construction issues, technical documents and handover stages is an important consideration.
  • Quality of follow-up. Decisions, observations and actions to be taken must be documented and organised.
  • Independence and transparency. Project owners must understand their adviser’s position and any links with other participants.

A well-defined assignment establishes a clear working framework and allows owner’s representation to be used where it adds the most value.

Conclusion: better preparation for better control of your project

A property project involves numerous decisions that can influence its final quality, cost and progress.

Owner’s representation gives owners, buyers and investors additional support to better understand these issues, organise monitoring and anticipate difficulties.

From reviewing technical documents to preparing for handover, tracking decisions and documenting defects, this approach helps strengthen control over the project.

For KERLINE SA, the aim is to support project owners in managing their property operations in a more structured way, taking account of their needs and the particular characteristics of each project.

Are you planning to buy, build or renovate a property in Geneva or French-speaking Switzerland? Contact KERLINE SA to discuss your project’s needs and define appropriate support.

Source

Le Temps — “Défauts de construction : pourquoi l’accompagnement technique se professionnalise en Suisse”, Serge Guertchakoff, published on 24 October 2026. French-language article; subscription required.

Further reading

In the OAKS journal

Related articles on KERLINE

Need expert guidance?

Let's discuss your project in 30 minutes.

Contact us
This site uses essential cookies to ensure proper functionality. No advertising cookies are used. Privacy Policy