Buying off-plan in Geneva: which contractual clauses should you check before signing?

Buying off-plan in Geneva, whether for a condominium (PPE) or a villa, often represents the investment of a lifetime. Since January 1, 2026, the Swiss legal framework has evolved to better protect buyers, particularly regarding construction defects. However, signing a contract remains a critical step where vigilance is essential.
Understanding the scope of the 2026 reform
The revision of the Code of Obligations (CO) and the Civil Code (CC) that came into force on January 1, 2026, marks a turning point. From now on, the right to free repair of defects is mandatory for construction contracts and sales of new buildings.
It is no longer possible for a developer to contractually exclude this warranty. This progress protects the buyer against abusive clauses that previously limited legal recourse.
Contractual clauses to scrutinize before signing
Before committing, several points must be rigorously analyzed in your sales or construction contract:
- The defect reporting period: The law now imposes a minimum period of 60 days to report defects after their discovery. Ensure that no clause attempts to reduce this period, as it would be void.
- The nature of the warranty: Verify that the contract does not limit your right to repair. The right to repair has become a pillar of buyer protection.
- The contract structure: In the context of a "land share" sale, you become the project owner. It is crucial to verify who is responsible for coordinating the work and how warranties are transferred.
- Delay penalties: A delivery delay can have heavy financial consequences. The contract must provide for clear and proportionate compensation in case of exceeding the agreed deadlines.
The importance of the technical description
The technical description is the document that defines what you are actually buying. It must be as precise as possible.
A vague mention like "high-end finishes" is insufficient. Demand details on materials, brands, energy performance, and equipment, as anything not written in this technical document risks not being executed according to your expectations.
Why be accompanied by a client advisor (AMO)?
Faced with the complexity of contracts and technical issues, the assistance of an independent professional is a major asset. At KERLINE SA, we act exclusively for the project owner to analyze your contracts, verify the compliance of descriptions, and ensure site monitoring.
As highlighted by the specialized journal OAKS (oaks.ch), technical support has become essential to secure real estate projects. To learn more, read this article on Construction client advisory in French-speaking Switzerland.
In conclusion, never sign a contract without a careful reading of the warranty clauses. Anticipation is your best protection, and KERLINE SA supports you at every step to turn your real estate project into a serene success.
Further reading
In the OAKS journal